Thursday, June 29, 2023

Glen Eagle Maintenance (6/29/23)

I would like to focus this week’s blog, not on golf conditions conditions or facility work but rather to take a moment and reflect on a life lived to it’s fullest.

This week has been a tough one for the entire Glen Eagle family. The sudden and unexpected passing of Don Vandermillen, our Head Golf Professional, has left a huge hole in our hearts and a void in our lives that will never be truly full again.


I came across the picture above, taken on a golf trip to Ireland which he talked about as one of the most fun and memorable experiences of his life. Seems like he created memories wherever he went. I know I, as will many of you remember fondly the memories he made with us.

Don was one of the funniest, quick whittled people I have ever known. He had a heart of gold, fiercely loyal to people he cared for, and compassionate to those he didn’t know as well.

He loved razzing people, especially me. I’ll never forget him making fun of my golf game, letting others people know that “he would have to get better to be bad” or “is it bad, well it’s not good” to which many times I had to agree. I usually quipped back that he was my teacher so that didn’t say much for him. To which we would both laugh.

He also loved to make fun of how much I talked and my Southern accent. During Greens Committee meetings or at our Managers meetings, he would send me a text saying “wrap it up already”. Some of those times while he was sitting right next to me. He would also say “are you speaking English, you hillbilly” or “say that again in English” to which I would bust out laughing. He had a particular habit of texting me something funny during zoom meetings to try and get me to laugh while on the camera which often times worked. I will miss his comic relief for sure.

We had many a morning meeting in his office discussing the day ahead and the going ons of Glen Eagle. From time to time he would sneak down to my office and rearrange the items on my desk just to mess with me. I will certainly miss both.

In the end, he touched many lives, including mine. Since his passing I have certainly reconsidered my impact on others and can only hope that like Don, we can all say that we left things better than we found them. Most of all I am thankful that I am able to call him a friend.

Carlos, our Outside Ops Supervisor was reflecting on his memories of Don this week and came across some video clips online from when he worked at Twin Eagles. He was able to paste them together and make a short video which I think captured just how fun, lighthearted, and funny Don was. I think it is a great way to remember Don, I know it is how I always will.





Thursday, June 22, 2023

Glen Eagle Maintenance (6/23/23)

 

Golf Course

The golf course has almost completely healed from the maintenance we performed a few weeks back during our course closure. The recent rains and hot weather have made the grass pop. We are seeing substantial growth which has resulted in dense fairways, thicker rough and green grass about everywhere you turn.

Hole #1


Hole #12 from behind the green

Common Grounds

The most notable happening in common grounds which will also benefit the golf course is the start of the lake bank restoration and cleaning of the lake interconnect between Sterling Lakes and Saratoga near the Divot and Pump Station.

The process includes pulling the soil that has washed off the lake banks over 30+ years out of the lake and spreading it on the lake bank where it was originally. After the soil is spread, cloth is laid on the lake bank and rip rap (6” rock) is laid on top of the cloth. The cloth and the rock help stabilize the bank and will slow down erosion moving forward. At the same time as the lake bank restoration is happening, MRI is also using a Vac Truck to “vacuum” soil that has built up in the pipe from the interior of the pipe. This work will allow water to flow efficiently to the south towards the pump station.

Before Pics…

North Side



South Side


Some of the equipment used to work on the project…

Heavy Equipment


Jetting head on the Vac Truck

Moving soil




Bank reestablished


Cloth laid


Rip Rap being installed




The work on this interconnect should be complete next week, then we move up to the pipe on hole #15. That process will be less big machinery and more physical labor so that the golf course doesn’t get torn up but the goal will be the same, unimpeded flow between lakes.

Facilities

Hector has been on a much needed vacation this week. More pictures from Facilities next week.

I look forward to seeing everyone on the course or in the facilities, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf and facilities too!



Thursday, June 15, 2023

Glen Eagle Maintenance (6/16/23)

 Golf Course

The golf course is recovering well and will continue to get better over the next couple weeks. The last couple weeks have been surprisingly dry with record high temperatures and as you can see from the haze in the picture below, very humid.


Common Grounds

Now that the course is back open we will be working on the list of items that accumulated over the last couple weeks. A good example is the trimming of a few palms along the lake in the common area next to Sterling Lakes.


Facilities

Last week when Hector went up in the attic over the dining room to investigate a leaking a/c unit what he found was surprising. There was old debris (a/c parts, insulation, trash) everywhere. This made it hard to get around and even harder to work on the a/c units. So this week we brought in a temporary laborer to work with Hector for a day to clean up the area. In the videos and pictures below you can see how much “junk” had been left in the attic over the years.

Before

Large amount of trash removed


After the area was cleaned up…so much better.


This type of behind the scenes work is not visible on a daily basis but having it done will make it easier for work to be done when issues arise in the future.

Hector also did some painting…

Sidewalk at Clubhouse

Experimenting with different paint colors for awnings around the clubhouse

And checking operation of pedestrian gate at Radio Road

I look forward to seeing everyone on the course or in the facilities, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf and facilities too!







Thursday, June 8, 2023

Glen Eagle Maintenance (6/9/23)

 Golf Maintenance

Maintenance closures are all about rejuvenation, removing the old and bringing in the new. I like to think off it as a spa day(s) for the turf.

This week we finished our wall-to-wall core aerificaiton, continued scalping of all turf surfaces, verticut greens (heavy) and topdressed tees and fairways

Verticutting greens (removing old matted, interconnected tissue which will promote new growth)


Once the greens are verticut, we blow off the chafe and drag the sand back in.


Scalping Collars to remove lip at edge of the green


Topdressing Tees & Fairways



Facilities

All the tile work on the roof has been completed. There is a small punch list of items that has to be completed along the soffits, new gutter installation will follow in the next few weeks, then the project will be completely wrapped up.




Hector had the pressure washer out again…



And spent some time in the attic to investigate a dripping a/c unit…


I look forward to seeing everyone on the course or in the facilities, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf and facilities too!


Thursday, June 1, 2023

Glen Eagle Maintenance (6/2/23)

Golf Course

This week is our 1st of 3 summer maintenance closures. Our focus this closure will be on aerification (greens, tees, fairways & roughs), and scalping of all turf (except greens).

Here are some of the tasks we are performing.

Topdressing greens after core aerification.



Core aerification of the tees, fairways, & roughs


Circle cutting of fairways


Circle cutting of tees


We are lowering heights of cut (HOC) to scalp off the old growth and allow new growth at the base of the plant. This will also help with density, as the turf will naturally tighten up when the HOC is lower.

Our normal tee and fwy HOC is 0.70”, the picture below of 17 fairway mowed at 0.50” and shows how smooth cutting off the old growth makes the turf. Our goal is to get the tees and fairways down to 0.25”, mow them at 0.25” until we reopen on the 13th then raise them up to 0.50” until the next closure.

For reference, here is a list of the “normal” HOC for each area and our goal HOC for this closure.

Greens:    0.125” to 0.125”
Tees/Fwys:    0.70” to 0.25”
Roughs:    1.5” to 0.75”


Facilities

While the course is closed, Hector took the opportunity to pressure wash the roof and area surrounding the restrooms on #13.

Before…







After…



Before…




After…

With rainy season right around the corner, Hector also did some maintenance (cleaning) of the drains between the Restaurant and the Activities Center.

Before…

After…




I look forward to seeing everyone on the course or in the facilities, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf and facilities too!