Thursday, August 25, 2022

Maintenance Update (8/26/22)

Golf Course

As these pictures of #18 show, the golf course is green and growing.

#18 provides another great example of the definition we get between the rough and fairways in the summer.

Due to warmer temperatures and longer daylight hours our Celebration Bermudagrass grows most vigorously during the summer and conversely has substantial reductions in growth during the winter when the temperatures are lower and days are shorter. We will try and build as much rough density and growth as possible this time of year to carry the definition as far into the cooler months as possible.


Common Grounds

Front entrance landscape updating




Facilities Maintenance

Project work has really started moving…

Painting trim at the clubhouse



Painting at the Divot and Fitness Center






Repairs to soffit at the Pool






Drywall repair in #13 restroom in preparation for painting soon


I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!


Thursday, August 18, 2022

Maintenance Update (8/19/22)

If you have been in SW Florida recently you know it has been hot. Every year we complain that it seems hotter than the last but according to Wink News, this year it really is.



There has been a lot of activity at GE this week so here we go…

Golf Course

 We started the week out with a light verticut and topdress. Light topdressing is intended to smooth the greens surfaces by removing excess and/or uneven turf growth. Topdressing has many benefits and as you will remember from when we heavy topdress greens during aerificaiton to dilute organic matter. Light topdressing does displace some organic material but is primarily intended to smooth green surfaces by filling in the small pores and imperfections between the turf and soil surface.




FPL has been out replacing power poles on #2 and will continue to the North along GE Blvd over the next several weeks.




Last but certainly not least, we added colorful plants behind #4 Tee box. This was an area identified by our Greens Committee for potential beautification and it is turning out great. Juan our Assistant Superintendent and the maintenance staff did a great job improving the look of this area.






Facilities Maintenance

One of our many summer projects is to pave the areas that have been broken up by tree roots in the parking lot. That starts with removing 4 trees that have overgrown their space and were the most problematic due to roots growing under the asphalt.

Below are before and near complete photos plus a video which is a little long but shows the entire process of taking down one of the large Oak trees.




Another project is repurposing the back room at the divot. Work was started this week by removing the wall that divided the area into two rooms.

Very soon we will be painting, installing new flooring, and adding TV’s and tables to complete the new casual dining area.

Here are some pictures of the process.








Much more to do but glad to have many of our summer projects well under way.

I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!

 

Thursday, August 11, 2022

Maintenance Update (8/12/22)

Golf Course Maintenance

With the sunshine, warm weather and rain we have been having, the course is nice and green! We currently sit at 45.96” of rain year-to-date. That’s 10.36” more than the same time period last year.

#13

#14


#15


#16


I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!

Thursday, August 4, 2022

Maintenance Update (8/5/22)

Golf Course Maintenance

Not quite two weeks post 2nd summer course closure and the course is looking really good.

#1


#5


#8


#17

Monday we were able to utilize being closed to spiked greens, lightly topdress greens, and apply a foliar (absorbed thru the leaves of the turf) fertilizer along with a plant growth regulator (PGR) - not pictured.





Facilities Maintenance

A major project is underway, the repair of the Radio Road wall. The repair worked started about a week ago but already improvements are noticeable when comparing before and after pictures of the work that has been completed so far.








I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!