Wednesday, May 27, 2026

Glen Eagle Maintenance (5/27/26)

Recent rain has the course looking good! Especially where I didn't spray herbicide 😂


As we move into summer, it certainly feels like the rainy season has officially arrived. With more than 5 inches of rain over the last week and forecasts calling for daily rain chances over the next 10 days, we are off to a great start. While the lakes are still below normal levels, they have risen nearly 12 inches, allowing us to turn the fountains back on throughout the community — a welcome sight for everyone.

Recent storms did bring us a reminder to get under cover when storms are near, and cover doesn't mean trees.




This Cypress Tree behind the Pro Shop took a direct hit from a lightening strike last week and in a split second blew it in half. A strong reminder of the lethal power lightening possesses.

Starting Monday, we will begin our summer cultural practices alongside several major summer projects. Two of the biggest projects include tee leveling and regrassing, as well as bridge redecking on holes 3, 4, & 15. We are excited to get these improvements underway, as both projects will have a significant positive impact on course conditions and the overall player experience once completed.

Our summer cultural practices are an essential part of maintaining healthy turf through the growing season and will include:

  • Verticutting greens
  • Greens aerification
  • Wall-to-wall thatch removal
  • Aerification throughout the course
  • Scalping of select turf areas

It will certainly be a busy summer, but these efforts are critical to continuing to improve course conditions and playability. We appreciate everyone’s patience during the process and look forward to seeing the results in the months ahead.

Wednesday, May 20, 2026

Glen Eagle Maintenance (5/20/26)

 Been a busy week around Glen Eagle. We got a lot of work done on our closed Monday (see below) which is why having that maintenance day is so important. We have also been lucky enough to receive 2.0” of rain since Sunday with the potential for more to come thru the end of the week. I saw post below online which indicates we will need approx. 45” of rain this summer to erase our total rain deficit. So, we still have a ways to go but hopefully the wait for rainy season has about come to an end.



Some of the work we completed on Monday…
Spiked Greens (2x)

Spiking stimulates turf growth and density by cutting grass stems which forces the turf to produce more branches where leaf tissue grows from. It also breaks up any algae that may be under the surface of the turf canopy, and provides some increased air/water/gas exchange in the top half inch of the soil.

Lightly Topdressed Greens

Light topdressing smooths the greens surfaces and gives new tissue a place to grow into.

Fertilized Greens

Fertilizer encourages dense growth

Watered in Fertilizer

Water after fertilizer application disperses and breaks down the fertilizer for the plant to use. It also helps prevent any potential burn that could occur by the elements in the fertilizer staying in contact with the leaves of the plants.

Tee Project Updates

Results of 1st Herbicide Application to Tees

Fertilizing Tees to Stimulate Growth of Any Living Grass

If you zoom in, you can see a few pieces of grass trying to regrow

We will apply a 2nd herbicide application on Memorial Day after the morning shotgun is complete and the course is closed to kill any remaining turf regrowth prior to physically removing the grass staring on June 1st.

Wall-to-Wall Fertilizer & Pre-Emergent Herbicide

Feeds the grass and prevents weeds.

Watering in Wall-to-Wall App

I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!

Wednesday, May 13, 2026

Glen Eagle Maintenance (5/13/26)


The golf course is really starting to grow and continues to look good since last week's rain and temperatures that are in the 70's at night and 90's during the day.

This week, we made a significant step toward this summer’s tee laser leveling and regrassing project. On Monday, the first of two non-selective herbicide applications was completed as part of the preparation process.

Non-selective, for our purposes, means the herbicide will kill both weeds and grass. We spray a non-selective herbicide prior to the physical removal (stripping) of the grass because one of the main goals of this project is to eliminate the encroachment of Common Bermuda.

The primary grass type on our course is Celebration Bermudagrass, a hybrid variety with growth characteristics that are much more conducive to playing golf. Those characteristics include fine texture, high density, and rapid recovery from damage. Common Bermuda is essentially the opposite. It is very coarse in texture, which reduces surface density, and for much of the year its recuperative ability is slower compared to Celebration.

However, Common Bermuda is also a very strong, thick-stemmed, and deep-rooted grass that can weaken and outcompete Celebration during certain times of the year. When Common Bermuda takes hold in an area, it often pushes out the Celebration turf — something that has occurred on several tees here at Glen Eagle.

Here are a couple pictures of the inconsistency currently on the tees due to the Common Bermuda...


That brings us back to the purpose of the herbicide applications prior to stripping the grass. The goal is for the herbicide to translocate systemically from the foliage through the plant and deep into the roots. Common Bermuda is difficult to kill and almost impossible to eliminate entirely, but spraying it in a way that targets the root system gives us the best chance of limiting regrowth once the new Celebration tees are established.

I will admit that, as someone who spends most of his days trying to figure out how to grow better grass, Monday was a bit stressful. For perhaps the first time ever, I was intentionally trying to kill the grass we normally work so hard to protect. It was one of those mixed-emotion days where the head understands we are doing the right thing, but the heart and gut take a little longer to catch up.

This may sound counterintuitive, but next week we will fertilize the tees and then apply the second herbicide treatment the following week. The fertilizer is intended to stimulate any remaining grass growth so that, when we spray the second application, the herbicide is actively taken up by the plant. In a sense, it is like tricking the grass into thinking it has a chance to recover from the first application before ultimately receiving a final dose designed to ensure a more effective demise.

The grass will begin turning yellow and then brown fairly quickly — in fact, I could already see some chlorosis within 24 hours of the application (see pictures below). The biomass will still be there, so play can continue as normal until our closure starting 6/1, although the color will continue to fade over the next few weeks.


I will continue to keep everyone updated through pictures and progress reports throughout the process, and we look forward to having our beautiful tees back in top condition for the fall golf season.

One other picture captured this week...summer is in full bloom at the clubhouse!

I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!

Wednesday, May 6, 2026

Glen Eagle Maintenance (5/6/26)

 We received 1.9" of rain this week which really greened up the course and brought up our lakes 3 inches.

Here are a few pictures of the course after the rain...



We are looking forward to our first closed maintenance Monday next week (May 11th). During that time we will work on minor cultural practices like verticutting and topdressing greens. We will also apply our first application of herbicide to the tees in preparation for the tee laser leveling and regrassing starting June 1st.

You can expect the tees to turn off color and eventually brown over the next 7 to 10 days but tee surface will remain dense enough to play off of until we strip them during the project this summer. Killing as much of the off-type or Common Bermudagrass that we can prior to physical removal will give us the best outcome and purity once the project is completed. I will post pictures of the project as we move along throughout the summer for those of you who are not here so you can see the improvement in the course as we go along.

I look forward to seeing everyone on the course, and as always, if you have any questions, flag me down or shoot me an email. I always enjoy talking turf!