We finally had one of those typical afternoon thunderstorms on Saturday, receiving 2.1" of rain in that one event. In addition to that, we had another 1.73" for a total of 3.39" since last Wednesday. We are still lagging behind our normal June rainfall by 8" but very thankful for the rain that we did receive. The golf course is better because of it.
This past week we continued sodding the tee slopes and today we are planning on sprigging the front 9 tee tops.
The basic process of sprigging is to hand shake the sprigs on the tee top, and cut them into the soil with a vertical disk machine to tuck them into the soil, then roll them to increase soil contact. Once the sprigs are cut in and rolled, we water them frequently to keep them from drying out in the summer sun and fertilize frequently (1x/wk) to promote growth.
Here is a video of sprigging a green at Eagle Creek. The process is pretty much the same on tees.
Prior to sprigging, we applied a pre-emergent herbicide to keep weeds out of the newly sprigged tees and applied preplant fertilizer to help the sprigs get established.
Here is a video of the preplant fertilizer going out.
No comments:
Post a Comment